Assembly and Rigging The vast majority of aircraft control cables are terminated with swaged terminals, that must be a. corrosion treated to show compliance with the manufacturer’s requirements after the swaging operation. b. pull tested to show compliance with the manufacturer’s requirements after the swaging operation. c. checked with a go-no-go gauge before and after, to show compliance with the manufacturer’s requirements after the swaging operation.